In SCE's 2025 Emergency Load Reduction Program, the automated battery cohort (A.4) was called seven times and cut a statistically significant 7.3 MW, while the roughly 1.6 million-home residential behavioral cohort (A.6) was never called, so its capacity is unmeasured rather than zero. Both are subgroups of the same emergency program.
This figure is from the Southern California Edison case study, a primary-source look at how California procured storage and what pointing the same playbook at demand would add.
Cite this figure
Corey Balgeman, "SCE 2025 ELRP: enrolled sites versus events called," Grid Flexibility, 2026. https://gridflexibility.fyi/case-studies/southern-california-edison/figures/elrp-enrolled-vs-dispatched